-
Airfield Maintenance & Servicing
A directory of suppliers who provide airfield (runway, apron, taxiway) maintenance and servicing solutions. Examples include runway de-icing as well as runway and taxiway sweeping, cleaning and rubber removal. This section also lists suppliers who provide airfield maintenance vehicles as well as winter service equipment, waste collection and treatment, and drainage and water treatment. And of course you will find all the latest news about the area here.
-
Terminal Maintenance
A directory of airport industry suppliers who provide terminal maintenance services as well as all the latest news covering the area.
Maintenance News
-
US: FAA Announces $20 Million to Modernise Airports
The US Department of Transportation's Federal Aviation Administration (FAA) has announced 20.5 million USD in grants to modernise airports.
-
Jointline Invests 300,000 GBP in Hydroblasting
Jointline Limited has invested £300,000 in hydroblasting technology as part of its ongoing brand expansion.
-
29 Weeks of Night Shifts: Works to Resurface Heathrow's Southern Runway Completed
29 weeks of nightshifts later and the works to resurface Heathrow Airport's Southern Runway are finally complete.
-
Airfield Runway Specialist Jointline Invests £1m in Grooving Capabilities
Jointline Limited has invested £1 million in machinery to help sustain the growth of its runway grooving capabilities.
-
Ontario International Airport Completes Runway Improvement Project
Southern California’s Ontario International Airport (ONT) has completed a 90 million USD runway rehabilitation project.
-
Helsinki Airport’s Runway 3 to Close for Renovation from 15 April
Finavia is set to begin major renovation works on Helsinki Airport's runway 3, with all operations on the runway ceasing between 15 April & …
-
Oakland Airport Completes Taxiway W Rehabilitation Phase 1
In California, Oakland International Airport (OAK) has completed phase 1 of its Taxiway W Rehabilitation project.
-
Finavia to Complete Final Phase of Major Runway and Taxiway Renovation at Kuopio Airport
Finavia will complete the final phase of the highly extensive runway and taxiway renovation at Kuopio Airport. No flights been 24 Jun-6 Aug.
-
UK: Birmingham Airport Completes Airfield Maintenance Work
Birmingham Airport (BHX) has completed a 2.8 million GBP maintenance project to ensure its runway and taxiways remain safe and reliable.
-
Autonomous Airfield Inspection Vehicle Showcased at Toronto Pearson
The Greater Toronto Airports Authority has presented an autonomous airfield inspection vehicle at Toronto Pearson International Airport.
-
Raleigh-Durham Gains FAA Approval to Replace Primary Runway
The FAA has granted authorisation for Raleigh-Durham International Airport (RDU) to replace its primary runway, 5L/23R.
-
DFW Commences Rehabilitation Work on Runway 17R/35L
Dallas Fort Worth International Airport (DFW) has commenced work on Runway 17R/35L as part of its airfield improvement programme.
-
Finavia Completes Airfield Renovation Project at Lapland's Kuusamo Airport
Finavia has completed its airfield renovation project at Kuusamo Airport in Lapland, Finland following a 2.5 million EUR investment.
-
Ferrovial Trials Reactec Smart Watch to Enhance Worker Safety at Heathrow
Ferrovial Construction has trialled Reactec’s R-Link smart watch to improve worker safety at London Heathrow Airport (LHR).
-
Electric Vehicle Technology and Why it Matters
Oshkosh gives a brief breakdown of different kinds of electric-based vehicle systems, stressing the importance of the move to electric power…
-
San Francisco International Airport to Repave Runway 1L
San Francisco International Airport (SFO) has announced plans to repave and renovate its 1L runway this spring.
-
Granite Awarded Runway Construction and Rehabilitation Project at LAX
Granite has been awarded a 174 million USD contact to construct new exit taxiways and reconstruct sections of existing runways at LAX.
-
Toronto Pearson Opens Rehabilitated Runway 06L/24R
The Greater Toronto Airports Authority has re-opened Toronto Pearson International Airport's second-busiest runway: Runway 06L/24R.
-
Melbourne Airport North-South Runway to Undergo Safety-Critical Maintenance
Melbourne Airport's 2500m north-south runway will undergo safety-critical maintenance starting in November and lasting 11 months.
-
Recent Advancements of the Oshkosh Snozzle HRET
Oshkosh details recent innovations of its Oshkosh Snozzle - High Reach Extendable Turret (HRET), a powerful firefighting tool.
-
Gatwick Airport Completes Runway Resurfacing
London Gatwick (LGW) has completed the resurfacing of its main runway using 70% less asphalt compared to traditional resurfacing methods.
-
UAE: Al Bateen Executive Airport Completes Airside Upgrades
Al Bateen Executive Airport, located in Abu Dhabi city, has reopened following the completion of an airside refurbishment project.
-
PHL Pilots Nilfisk Automatic Cleaning Robot
Philadelphia International Airport (PHL) is deploying a Nilfisk robot floor scrubber to enhance cleaning procedures across its terminals.
-
Renovated Pedestrian Tunnels Open At Chicago O’Hare
Seven renovated pedestrian tunnels have reopened beneath the Lower Level Roadway at Chicago O’Hare International Airport.
